00:00 AMMelbourne, AUS
Barwon Heads Golf Club clubhouse, shingle clad, seen from the fairway
Service

Bill of Quantities (BOQ)

Full measured quantities, trade by trade, against the issued drawing set.
01/07
Of seven services
Service
Bill of Quantities (BOQ)
Number
01 of 07
Suits
Lump Sum and Design and Construct
Sectors
Residential to infrastructure
Turnaround
~10 business days, typical

A Bill of Quantities is the building written out as a list. Every item that has to be built is measured from the drawing set that exists on the day, described in the words the trade uses, and set against a unit and a quantity.

Who it is for
Builders pricing a tender, and developers who want the scope written out before anyone puts a rate against it.
Why it holds
Every builder pricing the job prices the same list, so the bids can be read against each other.

It protects the builder/developer against scope gaps. Without a well prepared BoQ you are guessing your tender number.

Hester Hornbrook Academy front entrance and forecourt

Who it is for

Three people read a bill of quantities and they all want something different out of it.

You're pricing a tender, so you need every trade written out before you put a rate on anything. The developer wants the scope on paper before anyone prices it. The project team wants one document so every builder in the tender is reading the same job.

The measure doesn't change between them. What happens next does.

That's the whole point of it. A properly prepared BoQ protects you against scope gaps. Without one you're guessing your tender number and hoping.

Lump sum or D&C, it works the same. On D&C we structure the breakups around the risk you're carrying: that's how we measured Barwon Heads Golf Club, a $20M–$30M clubhouse on the Bellarine.

Size changes the hours, not the standard. Harkness Memorial Park is $40M–$50M. It was measured the same way.

Nathan Holman, Estimating Manager at Alchemy Construct"We've worked closely with Costimate across a range of projects, relying on them to deliver detailed Bills of Quantities, tender estimates, and cost planning services. Their attention to detail, accuracy, and professionalism consistently gives us confidence in the information they provide."

What we deliver

The bill arrives as a document your estimators can price straight into, not as a spreadsheet that needs unpicking first.

Basis
The issued drawing set and specifications
01
Measurement
Trade by trade, against the geometry
02
Structure
A structured trade summary
03
Breakups
Clear breakups within each trade
04
Pricing
Returnable pricing schedules
05
Open questions
Clarification notes against the set
06
Check
Estimating Manager cross check
07
Ready for
Pricing, tender submission or internal review
08

How it is measured

Every item that has to be built, measured, described, set against a quantity.

The bill is the one document every party on a tender reads the same way. It is why the measure comes before the rate, and why a question in the drawing set is written down rather than assumed away.

Assume nothing. Believe no one. Check everything.
The Costimate Way, four stages, every job
01 Initial review Every project document read: drawing set, specifications, consultant reports, RFT and contract.
02 Risks and scope gaps Measurement begins while the Estimating Manager flags risks and clears uncertainties with your team.
03 Manager cross check Cross checked against our internal QS procedures for consistency and accuracy.
04 Final delivery A structured summary, clear breakups, returnable schedules and clarification notes.

The kinds of bill we measure

One document, set up differently depending on how the job is being let. The standard underneath it does not move.

Full bill
Every trade on the issued set, measured against the geometry
01
Design and construct
Trade breakups structured for the way a D&C builder carries the risk
02
Shared BoQs
Shared BoQs to align the playing field and no scope gaps are missed.
03
Trade breakups
Each trade split the way the packages will be let
04
Addendum re-measures
The bill brought up to the reissued set while the tender is still running
05
Clarification notes
Every question the drawings leave open, written against the set
06
Manager cross check
Checked against our internal QS procedures before it leaves the office
07
Measured in
Cubit, CostX, Mudshark, Planswift and Bluebeam
08

What we need from you

Everything the bill gets measured from. The more of it that arrives at the start, the less of the fortnight goes on chasing it.

  • The issued drawing set, at the current revision
  • Specifications, in full
  • Consultant reports, structural and services
  • The RFT and tender documentation
  • Contract and scope details
  • The tender date, and any addendum dates
Send it even if the set is incomplete. What is missing is a finding, not a blocker.

How an engagement runs

Drawings in Monday, priced bill back in ten business days.

Send the set
The issued drawings, the specifications and the tender date. We come back with what we can measure and when you will have it.
01
Measure and question
Measurement starts while the Estimating Manager raises the RFIs. Where the documents are silent it is written down, not assumed away.
02
Issue, then stay on it
Trade summary, breakups, returnable pricing schedules and clarification notes. Then addendums and post-tender support for as long as the tender runs.
03
Barwon Heads Golf Club dining room in daylight, windows to the links

On the drawing set

On design and construct, the risk sits with the builder. At Barwon Heads Golf Club we structured the breakups around it.

A $20M–$30M clubhouse on the Bellarine.

In the register

Projects the record carries a Bill of Quantities against, with the words their own file uses.

Yitpi Yartapuultiku
Bill of Quantities, $30M–$40M cultural centre, Port Adelaide
01
Noetic Place
Bill of Quantities, $75M–$100M, Hampton, Victoria
02
Barwon Heads Golf Club
Bill of Quantities with trade breakups structured for Design and Construct pricing, $20M–$30M
03
Harkness Memorial Park
Bill of Quantities completed, $40M–$50M, Harkness, Victoria
04
Wathaurong Dreaming Project
Bill of Quantities completed, $30M–$40M, North Geelong
05
Hester Hornbrook Academy
Bill of Quantities completed, $20M–$30M
06
Yitpi Yartapuultiku from the air, the Port River and the city behind
Artist impression of the proposed Wathaurong Dreaming Project community hub in North Geelong. Design by Woods Bagot.
Hester Hornbrook Academy facade and landscaping, Melbourne
Yitpi Yartapuultiku, Port Adelaide. Wathaurong Dreaming Project, North Geelong. Hester Hornbrook Academy, Melbourne.
Barwon Heads Golf Club clubhouse behind the dune grass

Worked examples

Three jobs the record carries a bill of quantities against, in the words their own files use.

Yitpi Yartapuultiku, Port Adelaide, $30M–$40M

A landmark cultural centre on the Port River. Full quantities and estimating support, with the care a community building demands. Cultural projects rarely follow standard details, so where the documentation left questions open we flagged them rather than guessed, and closed every scope gap with the project team before pricing. The Yitpi Yartapuultiku project page has the detail.

Barwon Heads Golf Club, Bellarine Peninsula, $20M–$30M

A design and construct clubhouse, and the tender we point to first. The full scope measured, and a complete bill with trade breakups structured for D&C pricing. Risks and scope gaps were flagged early in the drawing set, and every trade was cross checked against our internal QS procedures before handover. See the project page.

Hester Hornbrook Academy, Melbourne, $20M–$30M

A new educational facility for 220 students on a sloping site: undercroft, terraced landscaping, a basketball court, 45 parking spaces, specialist learning hubs and community spaces. Design and construct puts the risk on the builder, so the bill had to be honest about what the drawings did not yet say. Trade-specific takeoffs are on the record for this job as well. See the project page.

The jobs that are hard to measure

Value is not what makes a bill difficult. Geometry, ground and documentation are, and none of the three show up in a dollar figure.

A sloping site
Cut, fill and an undercroft at Hester Hornbrook Academy, all three quantities before they are anything else
01
Non-standard details
Cultural buildings like Yitpi Yartapuultiku, where fewer repeated bays means more one-off junctions
02
Full design and construct
CCVH Shepparton: civil, services connections, structure to finishes, on a 1,750 m² site
03
Distance
Eaton Fair in Bunbury, measured off the drawing set three thousand kilometres away
04

What a bill is not

A bill is not an estimate. It measures and describes the work; it does not put a rate against it. If you want the number as well as the measure, that is a full estimate. Takeoff, estimate or bill of quantities sets the three out side by side.

It is not a cost plan either. A cost plan sets a budget out by element while the design is still moving. A bill measures a set that has been issued. And it is not a single trade package: a subcontractor pricing one trade wants trade-specific takeoffs.

A bill measures what is drawn. It does not measure what is missing. That is why every bill we issue carries clarification notes against the set, and why the scope review sits in front of the measure rather than beside it.

Questions we get asked

What is a bill of quantities?

The building written out as a list. Every item that has to be built is measured off the drawing set that exists on the day, described in the words the trade uses, and set against a unit and a quantity. The long answer is in what a bill of quantities is.

How long does a bill of quantities take?

Ten business days is the typical run, drawings in to bill out. Send the tender date with the set and we confirm before anything starts.

What do you need from us to start?

The issued drawing set, the specifications and the tender date. If there are consultant reports, an RFT or contract documents, send those too. They are read in stage one, before measurement begins.

Is a bill of quantities the same as an estimate?

No. A bill measures and describes the work. An estimate puts a price against it. Most tenders want both, and in that order. Takeoff, estimate or bill of quantities explains which you need and when.

Can you measure a design and construct job?

Yes. Barwon Heads Golf Club was a $20M–$30M design and construct job with trade breakups structured for D&C pricing, and Hester Hornbrook Academy was another. On D&C the assumptions are written into the bill rather than left in somebody's head.

Do you measure outside Victoria?

Yes. 190 BoQs, cost plans and estimates in the last eighteen months, across six states and territories. The drawing set arrives electronically and the bill goes back the same way. Sydney, Perth, Adelaide and Brisbane each have a page.

Can you work from a partial drawing set?

Yes, and most tender sets are partial in some way. What is missing gets written down as a clarification rather than assumed. An incomplete set is a finding, not a blocker.

Do you re-measure when the drawings are reissued?

Yes. The bill is brought up to the reissued set as an addendum re-measure while the tender is still running, so anybody reading it later can tell which drawings the number came from.

Who checks the bill before it is issued?

The Estimating Manager, against our internal QS procedures. Every measure moves up the same line: junior estimator, estimator, senior estimator, Estimating Manager. Nothing leaves without that cross check.

Where we work

Bills of quantities measured for projects wherever the drawing set comes from. 190 BoQs, cost plans and estimates in the last eighteen months, across six states and territories, including rural and regional Victoria, the Northern Territory and rural Queensland.

Further reading

Written at the desk by Richard Valioukhov, Estimating Manager and Founder.

Get in touch

Talk to us about a Bill of Quantities. For tenders, BoQs, cost plans or a straight answer on your numbers, get in touch.

Send the drawing set and the tender date. We will tell you what we can measure and when you will have it. Bills of quantities for Sydney and Brisbane builders as well.
Next service
02 of 07
SEEK headquarters twin gabled brick facade, Cremorne
Full Estimates and Contract Estimating
Service02 of 07
ScopeWe sit in your estimating chair for the tender, from startups through to submission.