Full Estimates and Contract Estimating

Cost estimating at any design stage, and a contract estimator for the tender itself.
02/07
Of seven services
Service
Full Estimates and Contract Estimating
Number
02 of 07
Suits
Lump Sum and Design and Construct
Sectors
Residential to infrastructure
Turnaround
~10 business days, typical

An estimate puts a price against the work. We measure the quantities first and price them second, so the number is built out of the building rather than fitted to it. The estimate can land at concept, through design development, or as the tender number itself.

Who it is for
Builders taking a tender to submission, and clients who need to know what a drawing set is worth before it goes out. When the tenders stack up, we step in as your contract estimator and run it end to end.
Why it holds
Every line can be traced back to something measured, so the number survives being questioned.
Jamieson Way sporting hall, cantilevered gable over the brick base

Who it is for

Two jobs sit on this page. A full estimate is a number built out of the building. Contract estimating is us sitting in your estimating chair for the whole tender. We can step in as your contract estimator - end to end.

The estimate suits builders taking a tender to submission, and clients who want to know what a drawing set is worth before it goes out. It can land at concept, through design development, or as the tender number itself.

Contract estimating suits builders whose tenders have stacked up. When the work arrives faster than the desk can price it, we run the tender end to end: startups, RFIs, clarifications, the bill, the cost plan, and the numbers held together through to submission. Turn us on. Turn us off. That is the deal, and it is the reason most builders call the first time.

D&C (Design & Construct): From 20% drawings to 70%. Understanding the buildability before it's drawn. We price what isn't on the page yet, and every assumption is flagged and carried through.

Lump Sum Tender: Head to head against five other builders to secure the win. We sit on your side of the table, not the client's. See our stats below.

In the last eighteen months, 24 of the 50 tenders we ran as contract estimator were awarded to our client. The builder wins the tender. Our part is that the number underneath it was complete.

John Moran, Estimating Manager, Built: "Costimate has been an agile and dependable QS partner for our bid teams, bolstering the accuracy of our estimates. We appreciate the way Richard and his team value the importance and impact of their work on the commercial outcome for us as their client."

What we deliver

A full estimate is not a rate applied to a floor area. It is the building counted, line by line, from the drawing set that exists on the day.

Basis
The issued drawing set and specifications
01
Stage
Concept through to tender
02
Coverage
Every trade on the job
03
Method
Quantities measured, then priced
04
Packaging
Priced and packaged for submission
05
Open questions
Clarifications logged against the set
06
Check
Estimating Manager cross check
07
Suits
Lump Sum and Design and Construct
08

How it is measured

The building counted, line by line, not a rate applied to a floor area.

Fitout measurement punishes assumptions. Seven storeys of services, finishes and joinery at SEEK were taken off trade by trade, with clarifications logged against the drawing set as we went.

Assume nothing. Believe no one. Check everything.
The Costimate Way, four stages, every job
01 Initial review Every project document read: drawing set, specifications, consultant reports, RFT and contract.
02 Risks and scope gaps Measurement begins while the Estimating Manager flags risks and clears uncertainties with your team.
03 Manager cross check Cross checked against our internal QS procedures for consistency and accuracy.
04 Final delivery A structured summary, clear breakups, returnable schedules and clarification notes.

What contract estimating covers

The whole tender, not a document handed over at the start of it. Every item below is work we do inside your process rather than alongside it.

Tender startups
The job set up and the estimate structured before anything is priced
01
RFIs
Raised with your team early, not at the eleventh hour
02
Clarifications
Written against the drawing set, so the price that goes in matches the scope that comes out
03
The bill
Full quantities measured off the issued set
04
The cost plan
Where the design is still moving, priced by element
05
Tender analysis
Prices read back against the measure, with every gap named
06
Submission
The numbers held together through to the day it goes in
07
After submission
Addendums, quotes and post-tender support for as long as the tender runs
08

What we need from you

Everything the estimate gets priced from. On a contract estimating engagement, the earlier it arrives the more of the tender we can carry.

  • The issued drawing set, at the current revision
  • Specifications, in full
  • The RFT, tender conditions and returnable schedules
  • Consultant reports
  • The contract and scope details
  • The tender date and the submission format
If you want us in the chair, say so early. Contract estimating starts at the startup, not at the bill.

How an engagement runs

Drawings in Monday, priced bill back in ten business days.

Send the set and the date
The issued drawings, the specifications, the RFT and the tender date. We confirm the scope of our part and when the number lands.
01
We price it, and we ask
Quantities measured first, priced second. The Estimating Manager raises the RFIs and every assumption is written down where the reader will meet it.
02
Submission, and after
A packaged estimate with its own breakups, then addendums, quotes and post-tender support until the tender closes.
03
SEEK headquarters timber stair atrium from above, Cremorne

On the tender

An estimate is read by people looking for the gap in it. So the packaging matters as much as the arithmetic: a summary that opens onto its own breakups, and every clarification written where the reader will meet it.

Measured, checked and issued by Costimate, for projects across Australia.

In the register

Projects the record carries a full estimate against, with the words their own file uses.

SEEK Headquarters
Full estimate across seven storeys of fitout, $40M–$50M, Cremorne
01
Jamieson Way Sporting Hall
Full estimating support, the winning tender against six builders
02
380 St Kilda Road Spec Suites
Full estimating support, the winning tender against four builders
03
Garden State Hotel
Full estimating support, the winning bid against three builders
04
Point Grey, Lorne
Full estimating support, exposed coastal site, $15M–$20M
05
DHL Global Forwarding
Full estimating support, Melbourne Airport, up to $10M
06
Garden State Hotel courtyard beer garden, timber tables under globe lights
380 St Kilda Road street corner, curved glass entrance and bronze cladding
Jamieson Way sporting hall from below, cantilevered white gable
Garden State Hotel, Melbourne. 380 St Kilda Road, Melbourne. Jamieson Way, Point Cook.
SEEK headquarters from above at golden hour, Cremorne rooftops beyond

Worked examples

Four tenders the record carries a full estimate or full estimating support against.

SEEK Headquarters, Cremorne, $40M–$50M

A tender for the seven storey fitout of SEEK's Melbourne headquarters, designed by Hassell. The full estimate in 21 days: every trade measured, priced and packaged to support a competitive tender submission. Fitout measurement punishes assumptions, so seven storeys of services, finishes and joinery were taken off trade by trade with clarifications logged against the drawing set as we went. See the project page.

Garden State Hotel, 101 Flinders Lane, $5M–$10M

Two new levels plus extensive upgrades throughout a heritage pub, on a CBD site that required a Flinders Lane street closure. Full estimating support, and the winning bid against three builders. Harry Baylis, Managing Director at Turn Group: "Costimate took us from cost plan through to full tender support on Garden State Hotel, an iconic project for us." See the project page.

Jamieson Way Sporting Hall, Point Cook

A multi sports hall with amenities, function room, commercial kitchen and upgraded outdoor courts, built beside a community centre that stayed open and a primary school that stayed in session. Six builders priced it and ours won. Full estimating support, trade-specific takeoffs, and a risks and scope gap review before any of it was priced. See the project page.

380 St Kilda Road, Melbourne, $5M–$10M

Seven speculative office suites across Levels 2 and 5 for Mirvac, plus tenant make good works on Level 11. Four builders priced it under a lump sum and ours won. Repeated work still has to be counted once per suite, because no two of them are the same shape. See the project page.

The tenders that are hard to price

The register answers how big. Builders ring about how hard, and these are the conditions that make an estimate worth paying for.

A live venue
Garden State Hotel: steel trusses to 8.5 tonnes, Flinders Lane closed, a 120 tonne crane working over a working hotel
01
No tenant yet
Seven speculative suites at 380 St Kilda Road, where the measure has to hold for whoever signs the lease
02
A site that stays open
Jamieson Way, built beside a community centre still in use and a primary school still in session
03
Distance and specialist scope
Eaton Fair in Bunbury: three thousand kilometres away, with acoustic and fire separation to seven cinema tenancies
04
A design still moving
Design and construct bids, where the assumptions are written down rather than resolved
05

What it is not

A full estimate is not a rate applied to a floor area. The quantities are measured first and priced second, so every line traces back to something on the drawing set. If you only want the measure, that is a bill of quantities.

Contract estimating is not a permanent seat on your payroll. It is on for the tender and off after it. That is the arrangement, and it is why the line reads turn us on, turn us off.

It is not a promise about the outcome either. Builders do not engage an estimator to win more work. They engage one so the jobs they do win do not lose money. If the design is still moving and you want options weighed against each other rather than one number, that is cost planning.

Questions we get asked

What is contract estimating?

We sit in your estimating chair for a tender. Startups, RFIs, clarifications, the bill, the cost plan and the numbers held together through to submission. It is used most often when tenders stack up faster than the desk can price them.

What is the difference between an estimate and a bill of quantities?

A bill measures and describes the work. An estimate puts a price against it. Takeoff, estimate or bill of quantities sets out which one a job needs, and in what order.

How many of your tenders win?

The builder wins the tender, not the estimator. What the record says is that 24 of the 50 tenders we ran as contract estimator in the last eighteen months were awarded to our client.

Can you price a design that is not finished?

Yes. That is design and construct work, and it is most of what we do. Every assumption is written down rather than buried. Pricing a design that is still moving is the long version.

How quickly can an estimate be turned around?

Ten business days is the typical run. SEEK was seven storeys of commercial fitout and the full estimate went out in 21 days. Send the tender date with the set and we confirm before anything starts.

Do you stay on after the tender is submitted?

Yes. Addendums, quotes and post-tender support for as long as the tender runs. The engagement ends when the tender does, not when the document is handed over.

Can you work to a short tender deadline?

Often, and the answer comes before the work starts rather than after. Send the set and the date and we will say what we can measure in the time and what we cannot. A confirmed no is worth more to you than an optimistic yes.

Can you run more than one of our tenders at once?

Yes. 500+ BoQs, cost plans and full estimates in 8 years. 190 BoQs, cost plans and estimates in the last eighteen months. Overflow capacity is the reason most builders call the first time.

Do you work for developers as well as builders?

Yes. A developer usually wants to know what a drawing set is worth before it goes out, which is the same estimate read for a different purpose.

Where we work

Tenders priced for builders in every state we are sent drawings from. Six states and territories in the last eighteen months, including rural and regional Victoria, the Northern Territory and rural Queensland.

Get in touch

Talk to us about a full cost estimate. For tenders, BoQs, cost plans or a straight answer on your numbers, get in touch.

Send the drawing set and the tender date. We will tell you what we can measure and when you will have it. Full estimates for Sydney and Brisbane builders as well.
Next service
03 of 07
Jamieson Way multi sports hall, full timber court and gabled roof structure
Cost Planning and Value Management
Service03 of 07
ScopeOptions priced side by side, so the design decision is made on numbers.